Digital Infrastructure

Digital Infrastructure buildings by KLY Infra

Overview

What we deliver

Data centre campuses need support buildings that keep pace with the main build: generator halls, electrical rooms, cooling plant enclosures and ancillary facilities. KLY configures engineered steel buildings for these support functions, coordinated to the campus layout and delivered with a complete document pack.

KLY delivers the engineered building system and works alongside your appointed M&E, civils, commissioning and installation contractors. If your requirement spans wider than the building, ask — scope is agreed per project.

Buildings

Digital Infrastructure buildings

01

Data centre support buildings

Ancillary buildings across the campus — stores, workshops, security and welfare facilities — configured to the site's architectural and operational requirements.

02

Generator buildings

Buildings and enclosures for standby generators, configured for equipment access, exhaust and ventilation routes, and acoustic requirements.

03

Technical facilities

Buildings housing switchgear, UPS, transformers and distribution equipment, with layouts, openings and penetrations coordinated to the electrical design.

04

Cooling plant buildings

Enclosures and buildings for chillers, pumps and cooling plant, configured for airflow, service access and plant replacement routes.

These buildings are examples, not limits — if your requirement isn't listed, send it through and KLY will confirm the route.

Projects

Typical projects

  • Hyperscale and colocation campus support facilities
  • Standby power and generator compounds
  • Electrical and substation buildings on data centre sites
  • Cooling plant and chiller enclosures
  • Campus expansion and phased build-out programmes

Documentation

Documentation & traceability

Structural steelwork is manufactured under EN 1090 through qualified production partners, with the execution class set per project and certification held by the production partner. The document pack — material certificates, welding and inspection records, coating reports, drawings and delivery documentation — is formatted to support campus handover requirements.

Delivery

Delivery, managed by KLY

Deliveries are sequenced and labelled to suit phased campus programmes and constrained site access, with delivery terms and destination defined in the quotation.

Engineering

Engineering support

Every digital infrastructure building is engineered before manufacture and aligned with the campus design team — design basis, structural calculations, connection details and the interface information the M&E and civils packages need. Deliverables and design responsibility are agreed for the project.

Other building configurations can be assessed from your site, building use and equipment requirements.

FAQ

Digital Infrastructure questions

Typically generator buildings, electrical and switchgear buildings, cooling plant enclosures, plant screening and ancillary facilities such as stores, workshops and security buildings. These sit alongside the main data hall build and are often procured as a separate package.

Yes. Campus programmes are usually phased, and buildings can be configured once and released in sequenced batches — the same specification and document pack applied to each phase.

Acoustic criteria are set by the project's acoustic consultant and coordinated into the building configuration — attenuator positions, louvre sizing, envelope build-up and door specification. KLY builds the requirement into the specification rather than certifying acoustic performance.

No — the building system covers structure, envelope, doors, access and documentation. The equipment inside is supplied and installed by your appointed contractors, with the building configured around their layouts and access requirements.